- Permitting Under the Clean Air Act Total results: 19
-
Risk Management Program (RMP)
Total results: 285
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Waste disposal and containment Total results: 13
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Radiation Total results: 1
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 317 results
-
Criteria for selecting alternative release scenarios
As part of the hazard assessment, owners and operators of Program 2 and Program 3 covered processes must identify and analyze alternative release scenarios (40 CFR §68.28). What criteria should be used when selecting an alternative release scenario? The owner or operator of a stationary source subject to the risk…
- Last published:
-
How is waste leaving the derailment site tracked?
EPA on-scene coordinators are assigned to track liquid–and solid–waste trucks entering and leaving the derailment site. They log every truck, oversee the loading and covering of waste, truck washing and weighing, and the proper placement of placards. Responders take pictures throughout the process. All trucks go to approved and regulated…
- Last published:
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…
- Last published:
-
What happens after the track work is completed?
The track work has been the highest priority to remove most contamination as early as possible. This, plus preventing the spread of contamination by capturing water from the site and constructing a bypass of Sulphur Run around the site will continue into June. While track work and water management continue…
- Last published:
-
Does the distance to endpoint start at the process or stationary source boundary?
When selecting the worst-case release scenario for Program 2 and 3 processes as required by 40 CFR §68.25, a stationary source owner or operator must analyze the release scenario that results in the greatest distance to an endpoint. Does the "greatest distance to an endpoint" refer to the greatest total…
- Last published:
-
Using meteorological station data for off-site consequence analyses
For the purpose of the offsite consequence analyses required under 40 CFR Part 68, Subpart B, there are several instances in which data gathered at a local meteorological station may be used to establish the modeling parameters of wind speed, atmospheric stability, temperature, and humidity for the stationary source. How…
- Last published:
-
Underground storage tank off-site impacts to groundwater, drinking water, or soil
For the worst-case and alternative release scenarios of an underground storage tank, should I consider any impact on groundwater, drinking water, or soil? No. As part of the worst-case and alternative release scenarios, you need to define the offsite impacts to the environment (40 CFR §68.33) by listing the environmental…
- Last published:
-
Accidental releases from non-covered processes
Should the owner or operator include accidental releases from processes containing listed substances below the threshold quantity in the five-year accident history required under the hazard assessment provisions of 40 CFR Part 68, Subpart B, and in the incident investigation requirements under 40 CFR Part 68, Subparts C and D…
- Last published:
-
Why are industries exempt under OSHA's PSM subject to RMP?
The Program 3 prevention program requirements under 40 CFR Part 68 are almost identical to the requirements of OSHA's process safety management (PSM) standard. OSHA exempts certain industries from the PSM standard. Why does EPA not exempt those same industries from the CAA §112(r) risk management program requirements? EPA and…
- Last published:
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
What if the quantity in the process fluctuates?
What if the quantity in the process fluctuates? I may not have a threshold quantity now, but I will intermittently exceed the threshold quantity. You do not need to comply with the rule and file an RMP unless you have more than threshold quantity in a process; however, once you…
- Last published:
-
Administrative controls considered when determining worst-case release quantity
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Are Mechanical Controls Considered Administrative Controls?
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…