Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Renewable Fuel Standard (RFS1) Total results: 67
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Applicability/General Duty Clause Total results: 69
- Prevention Program Total results: 30
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 166 results
-
Why are industries exempt under OSHA's PSM subject to RMP?
The Program 3 prevention program requirements under 40 CFR Part 68 are almost identical to the requirements of OSHA's process safety management (PSM) standard. OSHA exempts certain industries from the PSM standard. Why does EPA not exempt those same industries from the CAA §112(r) risk management program requirements? EPA and…
- Last published:
-
What if the quantity in the process fluctuates?
What if the quantity in the process fluctuates? I may not have a threshold quantity now, but I will intermittently exceed the threshold quantity. You do not need to comply with the rule and file an RMP unless you have more than threshold quantity in a process; however, once you…
- Last published:
-
Hot Work Definition and Requirements
Facilities subject to the Program 3 Prevention Program requirements in 40 CFR Part 68 must include in their Risk Management Plan the date of the most recent review or revision of hot work permit procedures in Section 7.13. What is considered hot work and what are the requirements related to…
- Last published:
-
Do I have to conduct incident investigations of releases resulting from theft?
The incident investigation provisions of 40 CFR Part 68 (§§68.60 and 68.81) require facilities to investigate incidents that resulted in or could reasonably have resulted in a catastrophic release. Are covered facilities required to perform incident investigations of releases resulting from theft of covered substances, such as anhydrous ammonia? If…
- Last published:
-
Do Program 1 processes have to complete a process hazard analysis?
Do owners or operators of Program 1 processes have to complete a process hazard analysis? No. The Program 1 requirements do not include a process hazard analysis (40 CFR §68.12(b)). Program 3 processes require completion of a process hazard analysis (40 CFR §68.12(d)(3)) while Program 2 processes must complete a…
- Last published:
-
Is a hazard review synonymous with a process hazard analysis (PHA)?
The prevention program requirements under 40 CFR Part 68, Subparts C and D, include hazard reviews and process hazard analyses. Is a hazard review synonymous with a process hazard analysis (PHA)? No. A hazard review is different from a PHA. A hazard review is part of the Program 2 prevention…
- Last published:
-
Process identification and distance between vessels
How far apart do separate vessels have to be to be considered different processes? There is no hard and fast rule for how great this distance should be before you do not need to consider the vessels as part of one process. Two vessels at opposite ends of a large…
- Last published:
-
What does "same industrial group" mean?
Operations at a site that belong to the same three-digit North American Industry Classification System (NAICS) code prefix (which has replaced the old SIC codes) belong to the “same industrial group. In addition, where one or more operations at the site serve primarily as support facilities for the main operation…
- Last published:
-
Updating RMP if EPA lists a new substance
What if EPA lists a new substance? You will have three years from the date on which the new listing is effective to come into compliance for any process that is covered because EPA has listed a new substance.
- Last published:
-
How often must compliance audits be performed?
How often must owners or operators of stationary sources subject to the risk management program regulations perform compliance audits? The regulations at 40 CFR §§68.58(a) and 68.79(a) state that owners or operators must certify that they have evaluated compliance with the applicable prevention program provisions at least once every three…
- Last published:
-
Should tank capacity be considered when determining thresholds?
When determining whether a threshold amount of a regulated substance is present in a process (e.g., a tank), must the owner or operator of a stationary source consider the total capacity of the process, or the actual amount of regulated substance contained in the process? The threshold determination is based…
- Last published:
-
All I do is produce corn ethanol and sell it all to X Company, which is an ethanol marketer. Do I have to do anything, or can X Company generate the RINs for me?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Each producer of renewable fuel is responsible for generating the RINs that represent that renewable fuel. This function cannot be delegated or assigned to any other party, including a party to whom a producer sells its product. Question…
- Last published:
-
Does the chlorine listing apply only to gaseous forms of chlorine?
There is no qualifier attached to the listing for chlorine (40 CFR §68.130). The listing, therefore, applies to chlorine (CAS number 7782-50-5), regardless of physical state.
- Last published:
-
If laboratory chemicals are stored outside the laboratory, are they exempt from threshold determination?
Under 40 CFR Part 68, for the purpose of determining whether more than a threshold amount of a regulated substance is present at a stationary source, certain exemptions may apply. One such exemption is provided for "activities in laboratories" (40 CFR §68.115(b)(6)). If laboratory chemicals are stored outside the laboratory…
- Last published:
-
Calculating thresholds for toxic substances with concentration qualifiers
Several toxic substances are listed as regulated substances under 40 CFR §68.130 with concentration qualifiers (e.g., "conc 37% or greater"). What does this concentration mean? When determining whether a threshold amount of these substances exists in a process, should I consider the weight of the entire solution, or simply the…
- Last published: