Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Firm Certification Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 46 results
-
What is Vermiculite?
Vermiculite is the mineralogical name given to hydrated laminar magnesium-aluminum-iron silicate that resembles mica in appearance. All vermiculite ores contain a range of other minerals that were formed along with the vermiculite in the rock. Vermiculite ores from some sources have been found to contain asbestos minerals but asbestos is…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
Assigning program level 1 if a public receptors is just beyond distance to endpoint
Our distance to the endpoint for the worst-case release is 0.3 miles. The nearest public receptor is 0.32 miles away. What tools are available to document that the public receptor is beyond the distance to the endpoint so we can qualify for Program 1? The results of any air dispersion…
- Last published:
-
Process that meets Program 1 requirements and Program 3 applicability
Program 3 applies to processes in certain NAICS codes as well as any process subject to the OSHA Process Safety Management (PSM) standard, unless the process is eligible for Program 1. If a process meets the requirements of Program 1, but is also in NAICS code 32211 (one of those…
- Last published:
-
Can a process qualify for Program 1 if it has had an accident?
A process with more than a threshold quantity of a regulated substance had an accident with off-site consequences three years ago. After the accident, we altered the process to reduce the quantity stored onsite. Now the worst-case release scenario indicates that there are no public receptors within the distance to…
- Last published:
-
Program level 1 eligibility and accident history
A process with more than a threshold quantity of a regulated substance had an accident with off-site consequences three years ago. After the accident, we altered the process to reduce the quantity stored on site, although the quantity still exceeds the threshold quantity. Now the worst case release scenario indicates…
- Last published:
-
Program level 3 applicability and whether states have delegated OSHA programs
I am a publicly owned facility in a state with a delegated OSHA program. Why are my processes considered to be in Program 3 when the same processes in a state where federal OSHA runs the program are in Program 2? Federal OSHA cannot impose its rules on state or…
- Last published:
-
If a company has several legal entities, does each entity have to become a certified firm?
Answer: Yes, if the corporate structure is such that the parent company is not liable for actions of the separate legal entities. Question Number: 23002-18225 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My non-profit organization applies for and receives grants to renovate older homes. We do not perform the renovations ourselves, we hire renovation contractors to perform them on our behalf. Must my non-profit organization become an RRP-certified firm?
Answer: Yes, even though your organization's employees do not actually perform the renovation activities, your organization must be an RRP-certified renovation firm because your organization, through the grant process, is offering to perform renovations for compensation, i.e., the grant. Question Number: 23002-19775 Find a printable PDF copy of all frequent…
- Last published:
-
I am a facilities manager for a church with daycare and preschool programs. I recently became a certified renovator. If my staff and I do our own painting and remodeling work, do we need to be a certified firm?
Answer: Yes, if you perform, offer, or claim to perform renovations in a portion of the building that is a child-occupied facility. The RRP Rule defines a child-occupied facility as a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under 6 years…
- Last published:
-
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbance of paint will not occur?
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbances of painted surfaces will not occur? For example, a certified firm establishes containment and removes wall and…
- Last published: