Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Offsite Consequence Analysis (OCA) Total results: 57
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 65 results
-
Criteria for selecting alternative release scenarios
As part of the hazard assessment, owners and operators of Program 2 and Program 3 covered processes must identify and analyze alternative release scenarios (40 CFR §68.28). What criteria should be used when selecting an alternative release scenario? The owner or operator of a stationary source subject to the risk…
- Last published:
-
Does the distance to endpoint start at the process or stationary source boundary?
When selecting the worst-case release scenario for Program 2 and 3 processes as required by 40 CFR §68.25, a stationary source owner or operator must analyze the release scenario that results in the greatest distance to an endpoint. Does the "greatest distance to an endpoint" refer to the greatest total…
- Last published:
-
Using meteorological station data for off-site consequence analyses
For the purpose of the offsite consequence analyses required under 40 CFR Part 68, Subpart B, there are several instances in which data gathered at a local meteorological station may be used to establish the modeling parameters of wind speed, atmospheric stability, temperature, and humidity for the stationary source. How…
- Last published:
-
Underground storage tank off-site impacts to groundwater, drinking water, or soil
For the worst-case and alternative release scenarios of an underground storage tank, should I consider any impact on groundwater, drinking water, or soil? No. As part of the worst-case and alternative release scenarios, you need to define the offsite impacts to the environment (40 CFR §68.33) by listing the environmental…
- Last published:
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
Administrative controls considered when determining worst-case release quantity
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Are Mechanical Controls Considered Administrative Controls?
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Worst-case release from smaller process with larger distance to endpoint
The owner or operator of a stationary source covered by the risk management program regulations must conduct a worst-case release scenario analysis as part of the required hazard assessment (40 CFR §68.25). The worst-case release is defined as the release of the largest quantity of a regulated substance from a…
- Last published:
-
Can I use any previous three year meteorological data for worst case scenario?
I am trying to complete my worst case release scenario for the Risk Management Plan under §68.25. I understand that I am required to use a wind speed of 1.5 m/s and F atmospheric stability class as specified in §68.22(b), unless I can prove that at no time over the…
- Last published:
-
How many worst-case release scenarios must be analyzed and documented in the RMP?
As a part of the hazard assessment requirements in 40 CFR Part 68, Subpart B, I must analyze worst-case release scenarios and document certain analyses in my risk management plan (RMP). How many worst-case release scenarios must be analyzed, and how many analyses must be specifically documented in the RMP…
- Last published:
-
Identifying public receptors and property with restricted access
Does public receptor cover only buildings on a property or the entire property? If the owner of the land next to my site restricts access to the land, is it still a public receptor? Public receptors are not limited to buildings. For example, if there are houses near your property…
- Last published:
-
When to Revise OCA
The risk management program in 40 CFR Part 68 requires facilities to conduct an off-site consequence analysis (OCA) to provide information to state, local, and federal governments and the public about the potential consequences of an accidental chemical release. When does a facility need to revise its OCA? The owner…
- Last published:
-
No trespassing signs restricted access onsite or offsite public receptor
The definition of public receptor is "offsite residences, institutions (e.g., schools, hospitals), industrial, commercial, and office buildings, parks, or recreational areas inhabited or occupied by the public at any time without restriction by the stationary source ..." Offsite is further defined to include "areas within the property boundary [of the…
- Last published: