Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Offsite Consequence Analysis (OCA) Total results: 57
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 73 results
-
Criteria for selecting alternative release scenarios
As part of the hazard assessment, owners and operators of Program 2 and Program 3 covered processes must identify and analyze alternative release scenarios (40 CFR §68.28). What criteria should be used when selecting an alternative release scenario? The owner or operator of a stationary source subject to the risk…
- Last published:
-
Why is the sentence incomplete on page 34 In the section about collaboration?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
Does the distance to endpoint start at the process or stationary source boundary?
When selecting the worst-case release scenario for Program 2 and 3 processes as required by 40 CFR §68.25, a stationary source owner or operator must analyze the release scenario that results in the greatest distance to an endpoint. Does the "greatest distance to an endpoint" refer to the greatest total…
- Last published:
-
Using meteorological station data for off-site consequence analyses
For the purpose of the offsite consequence analyses required under 40 CFR Part 68, Subpart B, there are several instances in which data gathered at a local meteorological station may be used to establish the modeling parameters of wind speed, atmospheric stability, temperature, and humidity for the stationary source. How…
- Last published:
-
Underground storage tank off-site impacts to groundwater, drinking water, or soil
For the worst-case and alternative release scenarios of an underground storage tank, should I consider any impact on groundwater, drinking water, or soil? No. As part of the worst-case and alternative release scenarios, you need to define the offsite impacts to the environment (40 CFR §68.33) by listing the environmental…
- Last published:
-
Administrative controls considered when determining worst-case release quantity
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Are Mechanical Controls Considered Administrative Controls?
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Worst-case release from smaller process with larger distance to endpoint
The owner or operator of a stationary source covered by the risk management program regulations must conduct a worst-case release scenario analysis as part of the required hazard assessment (40 CFR §68.25). The worst-case release is defined as the release of the largest quantity of a regulated substance from a…
- Last published:
-
Can I use any previous three year meteorological data for worst case scenario?
I am trying to complete my worst case release scenario for the Risk Management Plan under §68.25. I understand that I am required to use a wind speed of 1.5 m/s and F atmospheric stability class as specified in §68.22(b), unless I can prove that at no time over the…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Why is Page 34 In the "data interpretation, statistical analysis and report writing, item (3) of effective plans" empty?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
How many worst-case release scenarios must be analyzed and documented in the RMP?
As a part of the hazard assessment requirements in 40 CFR Part 68, Subpart B, I must analyze worst-case release scenarios and document certain analyses in my risk management plan (RMP). How many worst-case release scenarios must be analyzed, and how many analyses must be specifically documented in the RMP…
- Last published: