Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Livestock and pet health impacts Total results: 1
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 38 results
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
Should I let my pets and/or children play in Sulphur Run and Leslie Run?
Until the stream characterization assessment is completed, and the results analyzed, recreational use of Sulphur and Leslie Run should be avoided. While surface water is tested every three days and has not shown any contaminants at levels that exceed health standards since May 1, further investigation is needed to determine…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
How do I determine if my farm could reasonably discharge oil into or upon navigable waters or adjoining shorelines?
You can determine this by considering the geography and location of your farm relative to nearby navigable waters (such as streams, creeks and other waterways). You should consider if ditches, gullies, storm sewers or other drainage systems may transport an oil spill to nearby streams. Estimate the volume of oil…
- Last published:
-
Mixture with oil as an additive (e.g., oil-based paint)
SPCC applicability thresholds for aboveground and completely buried oil storage capacities are established in 40 CFR §112.1(d)(2). If a facility has a tank that contains a mixture with oil as an additive, such as oil-based paint, should the entire mixture be counted towards a facility’s threshold capacity? Yes; if a…
- Last published:
-
Do service tanks on service trucks or pickups count in the calculation of the total storage on the farm?
Yes, you should include fuel tanks mounted on trailers, fuel trucks used exclusively on the farm and tanks in pickups toward the overall threshold of 1,320 gallons. Also, count 55-gallon drums, but don’t count any container smaller than that.
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Is my farm covered by SPCC?
For updated information on the WRRDA changes to farm applicability see the new farm fact sheet (PDF) .
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…