Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 36 results
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
How do I determine if my farm could reasonably discharge oil into or upon navigable waters or adjoining shorelines?
You can determine this by considering the geography and location of your farm relative to nearby navigable waters (such as streams, creeks and other waterways). You should consider if ditches, gullies, storm sewers or other drainage systems may transport an oil spill to nearby streams. Estimate the volume of oil…
- Last published:
-
Mixture with oil as an additive (e.g., oil-based paint)
SPCC applicability thresholds for aboveground and completely buried oil storage capacities are established in 40 CFR §112.1(d)(2). If a facility has a tank that contains a mixture with oil as an additive, such as oil-based paint, should the entire mixture be counted towards a facility’s threshold capacity? Yes; if a…
- Last published:
-
Do service tanks on service trucks or pickups count in the calculation of the total storage on the farm?
Yes, you should include fuel tanks mounted on trailers, fuel trucks used exclusively on the farm and tanks in pickups toward the overall threshold of 1,320 gallons. Also, count 55-gallon drums, but don’t count any container smaller than that.
- Last published:
-
Is my farm covered by SPCC?
For updated information on the WRRDA changes to farm applicability see the new farm fact sheet (PDF) .
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
Where can I go to learn more?
PitWatch.org is the online home of the Berkeley Pit Public Education Committee. This volunteer committee educates residents, students, and the public about the environmental management of the Berkeley Pit. Information includes the geology, hydrology, current events, and ongoing academic research associated with the Berkeley Pit. This committee frequently shares their…
- Last published: