Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 19 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
What sources make up the Tier 1 categories used in the emissions trends?
Tier 1 categories are assigned by source classification codes (SCCs) that are the most specific processes available in the NEI. The latest SCC list with the Tier 1 assignments can be downloaded from the EPA SCC website in Comma Separate Values (CSV) format.
- Last published:
-
What is the cause of the large decrease in electric utility emissions, particularly sulfur dioxide, starting in 1995?
SO2 emissions reductions from utilities during this time are primarily attributed to the impacts of the acid rain program. As described on EPA’s Acid Rain Program web page, Phase 1 of this program began in 1995 and affected 263 units at 110 most coal-burning electric utility plants in 21 eastern…
- Last published:
-
Why is the Confidentiality Order important?
The Confidentiality Order (Order) has been, and continues to be, effective in assisting the parties in reaching settlements under the framework established by the Court in US v. ARCO and still pending in court – six consent decrees to date have been entered since the Order was issued. There are…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
What projects has EPA been involved with in Butte related to the Superfund site?
A variety of actions and activities have been implemented to address the contamination in Butte, including: Assessments of risk have been conducted to quantify actual and potential human health risks due to potential exposure to tailings, waste rock, yard soils, indoor dust, attic dust, mercury vapor, surface water, and ground…
- Last published:
-
Why were the consent decree negotiations under a confidentiality order?
The confidentiality order was issued by the federal district court in 2002 to encourage and facilitate settlement negotiations. The court determined that the confidentially order was appropriate to ensure that the parties were afforded the opportunity to engage in frank, open discussion so that litigation could be settled promptly and…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
What does the Confidentiality Order not cover?
The Order does not apply to technical documents, discussions, and meetings concerning the implementation of the consent decrees that occur after the Court entered the consent decrees.
- Last published:
-
What work are the potentially responsible parties required to complete at Butte Priority Soils Operable Unit?
EPA will conduct oversight in consultation with the Montana Department of Environmental Quality (MDEQ) on all work to be implemented by Atlantic Richfield and Butte-Silver Bow County. Atlantic Richfield will perform work in the Butte Reduction Works, Northside Tailings, Diggings East, Buffalo Gulch, East Buffalo Gulch, and Grove Gulch areas…
- Last published:
-
Why do mobile source NOx emissions jump higher between 2001 and 2002 on the emissions trends?
The emissions model used for mobile sources changed from MOBILE6.2 to MOVES 2010 in December 2009. This change included a notable increase in NOx emissions. The EPA adjusted data back to 2002 to reflect the change in models. The higher emissions in 2002 are because of this method change and…
- Last published:
-
Why do the PM2.5 emissions for the electric utilities source category jump up between 1998 and 1999?
The estimation method for PM emissions from fuel combustion sources was enhanced beginning with the 1999 National Emissions Inventory. Prior to 1999, the emissions measurement data methodology only included the filterable portion (which means the solid particle matter at elevated stack temperatures). Beginning with the 1999 NEI, both the filterable…
- Last published: