Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental testing results Total results: 8
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 26 results
-
How can I get help interpreting well sampling results?
Residents requesting Columbiana County water well sample results or assistance interpreting results taken by AECOM or Stantec laboratories can email ( [email protected] ). Additionally, a toxicologist is available to answer questions at 800-222-1222. Columbiana County residents near East Palestine with drinking water wells can request sampling by calling 330-849-3919. Pennsylvania…
- Last published:
-
Is the air monitoring equipment detecting chemicals of concern?
Yes, the air monitoring and sampling equipment are capable of detecting many chemicals of concern in the community and currently detections are below levels of concern. Some of the monitoring equipment may not detect a portion of the chemicals at lower levels–specifically n-butyl acrylate. However, there are independent tools used…
- Last published:
-
Is anybody sampling State Line Lake and the pond near the derailment site?
Norfolk Southern collects daily samples from the surface water near the derailment site, north of the tracks. State Line Lake flows through a wetland area and into the surface water area where the samples are taken. The agencies are reviewing all surface water results and Norfolk’s proposed plan for characterizing…
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
What is the status of the sampling data from Leslie Run and Sulphur Run?
Sediment sampling in Leslie and Sulphur Run is complete. The data generated by this work are being evaluated and compared to human health and ecological risk threshold criteria. That will lead to a determination about whether additional actions will be required and what those actions should be.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
How is the sediment sampling in Leslie and Sulphur Run different than the eco-assessment?
The main purpose of sediment sampling is to understand the extent of sediment contamination in Sulphur and Leslie Run. The eco-assessment, however, focuses on the potential uptake of contaminants in fish and other organisms.
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
The authorship of the proposal can be co-written and co-submitted by a coalition. However, how can organizations document the budget? Do coalitions complete several line items budget for each of the members of the coalition and a budget narrative tying them all together? Do coalition members submit one line-item budget and all the coalition members who are not the PR will have a single item listed in the “other” category?
There should be one detailed budget narrative covering the entire project. Whoever is submitting the proposal and responsible for managing the agreement would provide their budget and all the object class categories that you are used too: personal, fringe, travel, equipment, supplies, contracting, and other. The other coalition members, if…
- Last published:
-
Did drinking water samples from the American Legion in East Palestine have detections of vinyl chloride?
No. The drinking water supplied to the American Legion from the Village municipal water system has been tested weekly since the incident and vinyl chloride has not been detected in the drinking water, nor any of the water supply wells. A filter company collected water at the American Legion, and…
- Last published: