Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Renewable Biomass Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 35 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
What are the recordkeeping requirements for a renewable fuel producer that uses used cooking oils and fats as feedstocks for renewable fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Renewable fuel producers using used cooking oils or animal wastes as feedstocks are required under 40 CFR 80.1454(d)(3) to obtain from their feedstock supplier, and maintain in their records, documents which certify that the feedstock meets the definition…
- Last published:
-
What materials from non-federal forestlands meet the definition of renewable biomass in RFS?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Slash and pre-commercial thinnings from non-federal forestland that is not ecologically sensitive forestland qualify as renewable biomass for purposes of RFS. Slash is defined in 40 CFR 80.1401 as the residue, including treetops, branches and bark, left on…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
How does the "active management" requirement in the definition of renewable biomass apply to land that changes status in the future?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In RFS2, EPA has interpreted the EISA requirement that existing agricultural land be "cleared or cultivated at any time prior to [December 19, 2007] and actively managed or fallow and nonforested" to apply to land that existed as…
- Last published:
-
If a facility is grandfathered, is it also exempt from the requirement that feedstocks must be renewable biomass?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Even if a facility is exempt from the 20% GHG reduction requirement, in order to generate RINs, the facility is still required to use feedstocks that meet the definition of renewable biomass. The definition of renewable fuel in…
- Last published: