Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Protect Your Family from Exposures to Asbestos Total results: 9
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 32 results
-
To whom do I report an oil discharge?
A facility should report discharges to the National Response Center (NRC) at 1-800-424-8802 or 1-202-267-2675 . The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. If reporting directly to NRC is not practicable, reports also can be made…
- Last published:
-
When must I report an oil discharge to NRC?
Any person in charge of a vessel or an onshore or offshore facility must notify the National Response Center (NRC) immediately after he or she has knowledge of the discharge.
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
My neighbor is re-siding and re-roofing his house and there is material all over the ground. Do I need to be worried about asbestos exposure?
Not all house siding or roofing materials contain asbestos. If you are concerned the material might contain asbestos, you can ask your neighbor whether or not the material has been tested for asbestos. Federal regulations regarding renovations or demolitions of asbestos-containing materials do not apply to a homeowner’s renovation of…
- Last published:
-
How do I know if I have asbestos in my home (in floor tile, ceiling tile, shingles, siding, etc.)?
The only way to be sure whether a material contains asbestos is to have it tested by a qualified laboratory. EPA only recommends testing suspect materials if they are damaged (fraying, crumbling) or if you are planning a renovation that would disturb the suspect material. Samples should be taken by…
- Last published:
-
What happens after a facility submits the information about an oil discharge to EPA?
The EPA Regional Administrator will review the information submitted by the facility and may require a facility to submit and amend its SPCC Plan. Facilities and equipment that qualified for the new streamlined requirements may lose eligibility for those options as determined by the Regional Administrator. A state agency may…
- Last published:
-
Who is subject to the Discharge of Oil regulation?
Any person in charge of a vessel or of an onshore or offshore facility is subject to the reporting requirements of the Discharge of Oil regulation if it discharges a harmful quantity of oil to U.S. navigable waters, adjoining shorelines, or the contiguous zone, or in connection with activities under…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
Reporting requirements for oil discharges
What are the reporting requirements for discharges of oil? If a discharge of oil reaches waters of the United States, it is reportable to the National Response Center under 40 CFR Part 110 , which was established under the authority of the Clean Water Act. Discharges of oil must be…
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
The authorship of the proposal can be co-written and co-submitted by a coalition. However, how can organizations document the budget? Do coalitions complete several line items budget for each of the members of the coalition and a budget narrative tying them all together? Do coalition members submit one line-item budget and all the coalition members who are not the PR will have a single item listed in the “other” category?
There should be one detailed budget narrative covering the entire project. Whoever is submitting the proposal and responsible for managing the agreement would provide their budget and all the object class categories that you are used too: personal, fringe, travel, equipment, supplies, contracting, and other. The other coalition members, if…
- Last published:
-
I found out the cement water pipes leading to my house (business) contain asbestos. What should I do?
If the pipes are damaged they should be properly repaired or replaced by your water utility. Learn more about asbestos in drinking water . Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from…
- Last published: