Search Frequent Questions
Filter By:
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental testing results Total results: 8
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 46 - 60 of 406 results
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does zoning affect the target housing determination? For example, would a pre-1978 house that is zoned for commercial or office use, but used for residential purposes be considered target housing?
In determining whether a pre-1978 property is target housing, it is the actual or intended use of the property that matters, not its zoning classification. Therefore, a pre-1978 house that is used or intended to be used as a residence, even if only temporary, is target housing regardless of its…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
If a door is outside the work area but used by workers to enter and exit the room, does the door need to be covered with plastic?
If the work area is smaller than the entire room, and the door is not within the work area, you do not need to cover the door with plastic. However, all personnel, tools, and other items, including the exterior of containers of waste, must be free of dust and debris…
- Last published:
-
For an exterior renovation where vertical containment is set up at a distance of less than ten feet from the work surface, must we still extend the ground containment beyond the vertical barrier to meet the ten-foot requirement?
My firm replaces windows. Various obstacles make it difficult to set up the ten-foot exterior ground containment in a way that would enable our renovators to perform the work and still effectively contain dust. In these cases, we lay the ground containment, but also use vertical containment measures to completely…
- Last published:
-
In the EPA Certified Renovator Initial course, plastic sheeting is taped to the floor at several corners, but not around the entire perimeter. Must the plastic be "sealed" to the floor on all four edges by tape or just taped at several locations?
It depends on the specifics of the renovation job. The RRP Rule requires the renovation firm to cover the floor surface, including installed carpet, with taped-down plastic sheeting or other impermeable material in the work area 6 feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to…
- Last published:
-
Is the certified renovator assigned to a specific project responsible for the work practices of other contractors on the project if the certified renovator is an employee of the general contractor of the project?
All firms performing renovations must ensure that all individuals performing renovation activities on behalf of the firm are either certified renovators or have been trained by a certified renovator. A firm acting as a general contractor may satisfy this requirement by hiring another certified firm that takes responsibility for ensuring…
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If there are differences among EPA's, HUD's, and my State's lead-safe work and housing requirements, which ones do I have to comply with?
You must comply with all applicable requirements. The initial 8-hour renovator training course will teach you how to perform lead-safe work practices safely and effectively in compliance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule and the Housing and Urban Development (HUD) Lead Safe Housing Rule. The RRP…
- Last published:
-
My firm is replacing windows in a condominium. Is this type of exterior work considered work in a common area, and if so, must other owners and occupants be informed about the job?
Exterior renovations of multi-unit target housing are considered renovations of a common area. A common area is a portion of a building that is generally accessible to all residents or users of the building. Renovations in common areas of multi-unit target housing, such as condominiums, must be performed in accordance…
- Last published:
-
Is my EPA renovator certification accepted in all states and tribal areas?
Answer: Not necessarily. Whether to accept certification from another jurisdiction is up to the individual state or tribal area. EPA cannot compel states or tribes to adopt programs identical to the Federal program or to establish reciprocity provisions. However, EPA continues to encourage states and tribes that may be considering…
- Last published:
-
What about a situation where the homeowner is acting as their own general contractor and hires multiple companies to do different portions of the work? In this situation, would each business participating be required to follow the rules and assign a separate certified renovator to supervise their portion of the work including separate containment?
Answer: While the homeowner may be performing the role of general contractor by hiring firms and organizing their work, the homeowner is not performing, offering, or claiming to perform a renovation and therefore does not need to be a certified firm. The firms hired by the homeowner to perform renovation…
- Last published:
-
Thousands of renovators are already trained and their firms are EPA certified. Will EPA enforce against renovators who did not receive their training certification before December 31, 2010?
It is most important that all contractors follow the RRP work practice standards. However, EPA is providing additional time for renovation firms and workers to obtain the necessary training and certifications before the enforcement of the firm certification and individual renovator requirements begins. Therefore, renovators who have not been able…
- Last published: