Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 39 results
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
Where can I go to learn more?
PitWatch.org is the online home of the Berkeley Pit Public Education Committee. This volunteer committee educates residents, students, and the public about the environmental management of the Berkeley Pit. Information includes the geology, hydrology, current events, and ongoing academic research associated with the Berkeley Pit. This committee frequently shares their…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
Why is the Confidentiality Order important?
The Confidentiality Order (Order) has been, and continues to be, effective in assisting the parties in reaching settlements under the framework established by the Court in US v. ARCO and still pending in court – six consent decrees to date have been entered since the Order was issued. There are…
- Last published:
-
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated event. How long does such a building remain a child-occupied facility?
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated or rare event. How long does such a building remain a child-occupied facility? Answer: A building, or portion of a building, is…
- Last published:
-
Are renovations that disturb stucco subject to the RRP Rule? Does it matter whether the stucco has been painted?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. Therefore, renovations that disturb stucco are subject to the RRP Rule only if the stucco has been painted. Question Number: 23002-14025 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are Department of Energy weatherization projects covered under the RRP Rule?
Answer : The Lead Renovation, Repair, and Painting (RRP) Rule defines “renovation” to include weatherization projects such as cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, and planing thresholds to install weather stripping. Other types of weatherization projects, such as window replacement, are…
- Last published:
-
If I am painting a wall on which there are multiple coats of latex paint over the old lead-based paint and the paint is not peeling down to the lead paint level must I comply with the new Renovation, Repair, and Painting (RRP) regulations?
Yes, if the painted surface of the wall will be disturbed by the renovation. Question Number: 23002-18485 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a homeowner removes all the painted surfaces in a room and then hires a certified firm to remodel the room, does the renovator need to follow the RRP Rule?
No. Projects that do not disturb a painted surface are not subject to the RRP Rule. Question Number: 23002-18301 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published: