Can an engineering review on a facility with multiple fuel pathways be combined into one report?
Yes. The engineering review for a renewable fuel facility that contains multiple fuel pathways may be combined into one report. However, all information that is required to be reviewed and verified by the third party engineer conducting the engineering review should be included and identified separately for each fuel pathway in the engineering report.