This page will assist renewable fuel and foreign ethanol producers in completing their updated engineering review (ER) obligations under EPA’s Renewable Fuel Standard (RFS). This covers both updated 3-year ERs and updated ERs related to facility changes.
General Guidance
- Producers should use this page in conjunction with the regulations, not in lieu of reading the regulations.
- For a full description of the updated 3-year engineering review (ER) report requirements, see: Title 40 CFR Part 80.1450(d)(3)
- For a full description of the updated ER report requirements related to facility changes, see: Title 40 CFR Part 80.1450(d)(1)
- Updated ER reports may no longer be submitted by mail and MUST be submitted electronically. See the step-by-step instructions for more details.
- As of April 1, 2018, updated ER reports must be submitted in OTAQREG using the ER web form by the third-party independent professional engineer (PE).
- How to Manage Engineering Review Submissions in OTAQREG (pdf) (1.4 MB, September 2018, EPA-420-B-18-042)
- The PE must be registered in CDX and associated with the company in OTAQREG to complete and submit the ER web form. For instructions, see: How to Become a Delegated User of a Registered Company in OTAQREG (pdf) (352 KB, June 2018, EPA-420-B-18-032)
- All producers of renewable fuel and foreign ethanol producers are required to submit an independent third-party ER report at registration and an updated ER report by January 31 of every third calendar year thereafter.
- For example, a renewable fuel facility initially registered in 2010 is required to submit a 3-year update by January 31 of 2013, 2016, 2019, and so on.
- To help provide clarity, the EPA has compiled a list of registered renewable fuel and foreign ethanol production facilities and a schedule for when updated 3-year ER reports are due. To view 3-year ER report due dates, see: Schedule for Three-year Update Reports for Engineering Reviews (ERs).
- All producers of renewable fuel and foreign ethanol producers are required to submit an updated ER report when they make a change to the fuel production information at the facility.
- If a renewable fuel or foreign ethanol producer submits an updated ER report with a VRIN analysis to EPA for a facility in the calendar year preceding the scheduled updated 3-year ER report due date, EPA will accept it in place of the updated 3-year ER report. Please contact the Fuels Program Helpdesk in the following January to confirm that submission as the 3-year ER report.
Step-by-step Instructions
Step 1: Assemble required materials.
The renewable fuel or foreign ethanol producer must assemble all materials required under §80.1450(b)(1).
- Template for Engineering Reviews (pdf) (147 KB, October 2015, EPA-420-B-15-077)
Step 2: Obtain an engineering review from third-party professional engineer (PE).
The renewable fuel or foreign ethanol producer must obtain an engineering review conducted by an independent third-party professional engineer per §80.1450(b)(2). The professional engineer must verify and explain how the accuracy of all materials assembled by the producer per §80.1450(b)(1) was evaluated.
- Webinars on Engineering Reviews:
- Slides for presentation on Separated Food Waste Plans (pdf)
Step 3: PE reviews VRIN calculations.
For a 3-year update ER, the PE must include a detailed review of the renewable fuel producer’s VRIN calculations per §80.1450(b)(3)(iii). The VRIN calculation review is only required for a producer that generates RINs.
Step 4: Update any outdated registration information.
If any registration information has become outdated, the renewable fuel or foreign ethanol producer must generate a request for a Company Update in CDX OTAQREG. (If all registration information remains current, do not generate a request.)
- For more information about generating requests, see: How to Update Existing Companies, Facilities, and Users for Part 80 Fuels Program.
To complete the request, obtain the Responsible Corporate Officer (RCO) signature.
- If the RCO does NOT have e-signature capabilities, see: How to Enable RCO E-Signature Capabilities in OTAQREG (pdf) (629 KB, June 2018, EPA-420-B-18-033)
Step 5: PE submits ER report and materials through web form.
The independent third-party PE must be associated with the renewable fuel or foreign ethanol producer in CDX OTAQREG with the “Independent Third Party Engineer” role. The PE must submit the ER report and materials required under §80.1450(b)(1) to EPA by filling out and submitting the ER web form available within CDX OTAQREG.
- How to Become a Delegated User of a Registered Company in OTAQREG (pdf) (352 KB, June 2018, EPA-420-B-18-032)
- How to Manage Engineering Review Submissions in OTAQREG (pdf) (1.4 MB, September 2018, EPA-420-B-18-042)
Step 6: Check status of your request.
Once materials have been submitted, check the status of your request.