Cleanup Status
Note: The EPA is the lead agency for managing cleanups at this facility.
On August 14, 1980, James Spring and Wire submitted its initial Notification of Hazardous Waste to EPA for its generation of hazardous wastes F001 (spent nonhalogenated solvents), F006 (wastewater treatment sludges), F007 (spent cyanide plating solution), and F009 (spent stripping solution). On November 14, 1980, the Facility submitted to EPA its Part A Permit Application for storage and treatment of these wastes in drums and tanks, and on August 6, 1981, EPA granted the Facility interim status for treatment, storage, or disposal of hazardous waste.
On September 15, 2014, EPA issued the Final Remedy, RCRA Corrective Action Complete with Controls, to the Facility. The Final Remedy consists of implementation of the institutional controls through an enforceable environmental covenant that require maintenance and inspection of the concrete floor of the building and compliance with land and groundwater use restrictions. An environmental covenant was developed by Pennsylvania Department of Environmental Protection (PADEP) and the EPA.
Cleanup Actions or environmental indicators characterizing the entire facility are shown below. It is not intended as an extensive list of milestones/activities. This listing, and all the data on this page, come from EPA’s RCRAInfo and are refreshed nightly to this page. For this table and the Cleanup Activities Pertaining to a Portion of the Facility table that follows, a blank in the Status column could mean the action either has not occurred or has not been reported in RCRAInfo.
Cleanup Activities Pertaining to the Entire Facility
Action | Status | Date of Action |
---|---|---|
Human Exposure Under Control Human Exposure Under Control(CA725) | ||
Groundwater Migration Under ControlGroundwater Migration Under Control (CA750) | ||
Remedy DecisionRemedy Decision (CA400) | ||
Remedy ConstructionRemedy Construction (CA550) | ||
Ready for Anticipated Use Ready for Anticipated Use (CA800) | ||
Performance Standards AttainedPerformance Standards Attained (CA900) | ||
Corrective Action Process TerminatedCorrective Action Process Terminated (CA999) |
For definitions of the terms used, hover over or click on the term.
Cleanup Activities Pertaining to a Portion of the Facility
Action | Area Name | Date of Action |
---|
For definitions of the terms used, hover over or click on the term.
Facility Description
Link to a larger, interactive view of the map.
The facility is located at 6 N. Bacton Hill Road, Frazer, East Whiteland Township, Chester County, Pennsylvania. Light commercial facilities are located to the north, east, and south in the immediate vicinity of the facility. Current production processes at the facility include spring grinding, cleaning, passivation, heat treating, assembly, and special packaging. The facility also performs surface treatment on steel parts including rust preventative and deburring. Hazardous wastes generated at the facility include spent non-halogenated solvents (F001), wastewater treatment sludge (F006), spent cyanide plating solution (F007), plating bath residues containing cyanide (F008), spent stripping solution (F009), and characteristic ignitable hazardous waste (D001).
Contaminants at this Facility
Hazardous wastes generated at the facility include spent non-halogenated solvents (F001), wastewater treatment sludge (F006), spent cyanide plating solution (F007), plating bath residues containing cyanide (F008), spent stripping solution (F009), and characteristic ignitable hazardous waste (D001). Some concentrations of contaminants may remain in the groundwater at the Facility above levels appropriate for residential and domestic uses.
Institutional and Engineering Controls at this Facility
Institutional controls include limiting the site to non-residential uses, limiting groundwater beneath Facility property not be used for any purposes, and maintenance of the "cap" (the Manufacturing Building's Concrete Floor).
Institutional and Engineering Controls help ensure human exposure and groundwater migration are under control at a cleanup facility. Where control types have been reported by states and EPA in EPA’s RCRAInfo, they are shown below. Not all control types are needed at all facilities, and some facilities do not require any controls. Where there are blanks, the control types may not be needed, may not be in place, or may not be reported in RCRAInfo.
Are Controls in Place at this Facility?
Control(s) Type |
Control(s) in Place? |
Areas Subject to Control(s) |
Documents available on-line: |
|
---|---|---|---|---|
Institutional ControlsNon-engineering controls used to restrict land use or land access in order to protect people and the environment from exposure to hazardous substances remaining in the site/or facility. (CA 772) |
Informational DevicesInformational Devices (ID) |
|||
Governmental Controls (GC) |
||||
Enforcement and Permit Tools (EP) |
||||
Proprietary ControlsProprietary Controls (PR) | ||||
Engineering ControlsEngineering measures designed to minimize the potential for human exposure to contamination by either limiting direct contact with contaminated areas or controlling migration of contaminants. (CA 770) |
Groundwater ControlGroundwater Control (GW) |
|||
Non-Groundwater |
For definitions of the terms used, hover over or click on the term.
Enforcement and Compliance at this Facility
EPA’s Office of Enforcement and Compliance Assurance (OECA) provides detailed historical information about enforcement and compliance activities at each RCRA Corrective Action Site in their Enforcement and Compliance Historical Online (ECHO) system.
RCRA Enforcement and Compliance Reports from ECHO
Related Information
For more information about this facility, see these other EPA links:
- RCRA information in EPA’s Envirofacts database
- Information about this facility submitted to EPA under different environmental programs as reported in EPA’s Facility Registry Services
- Alternative Names for this facility as reported by EPA programs in EPA’s Facility Registry Services
- Cleanups in My Community provides an interactive map to see EPA cleanups in context with additional data, and lists for downloading data
- Search RCRA Corrective Action Sites provides a search feature for Corrective Action Sites
Documents, Photos and Graphics
Contacts for this Facility
EPA Region implements and enforces the RCRA Corrective Action program for and federally recognized tribes.
For further information on this corrective action site, use the Contact Information for Corrective Action Hazardous Waste Clean Ups listings that are accessible through Corrective Action Programs around the Nation.