Detroit Edison Company - Permitting Information
1. Facility Information
Detroit Edison Company
2. Location
3500 Front Street, Monroe, MI
3. Distance from US/Canada Border
about 25 km
4. Facility Type and Size
proposed modification to the existing boilers
5. Sources of Emissions
Boiler # 3 (output 823 MW) and Boiler #4 (817 MW)
6. Type of Fuel
natural gas, coal, petroleum coke
7. Type and Quantity of Emissions
PSD APPLICABILITY TABLE |
|||||
---|---|---|---|---|---|
Emissions (tpy) | |||||
Pollutant | Baseline Actual Emissions* |
Potential to Emit for Existing Units (without control) | Potential to Emit for New Units | Potential Emissions Increase |
Significant Level |
PM | 2,062 | 10,419 | 5.6 | 8,362.6 | 25 |
PM10 | 3,361 | 13,758 | 1.5 | 10,398.5 | 15 |
SO2 | 59,601 | 106,858 | 0.0 | 47,257 | 40 |
NOx | 12,415 | 34,061 | 0.9 | 21,646.9 | 40 |
CO | 4,229 | 15,895 | 0.3 | 11,666.3 | 100 |
VOC | 171 | 240 | 0.0 | 69 | 40 |
Sulfuric Acid (H2SO4) Mist | 913 | 1,069 | 0.0 | 156 | 7.0 |
Fluorides (as HF) | 303 | 425 | 0.0 | 122 | 3.0 |
Lead | 0.44 | 3.10 | 0.0 | 2.66 | 0.6 |
* Baseline period for all pollutants is from April 2007 to March 2009. This meets the NANSR requirement of a consecutive 24-month period. |
8. Emission Control Technology
Low NOx burners, dry wire electrostatic precipitators, wet flue gas desulphurization systems, selective catalytic reduction systems, good combustion practices
9. Date Permit Application Received
April 2009
10. Stack Height and Diameter
The stacks’ minimum heights above ground level and maximum diameters are in concordance with 40 CFR 52.21 Subparts (c) and (d) (maximum diameter is 336 in and minimum height 805 ft)
11. Permit Agency Contact
Michigan Department of Natural Resources and Environment
Air Quality Division,
Constitution Hall,
525 West Allegan Street
PO Box 30260
Lansing, MI, 48909 - 7760
Tel. 517 373 - 7088