Subpart W Rulemaking Activity: Applications
Documents related to Pinon Ridge Mill and the application for approval of construction of a tailings facility are available below.
- Cover Letter: Energy Fuels Resources Corporation (pdf)
- Application for Approval of Construction: Pinon Ridge Tailings Facilities (pdf)
- (Attachment 1) Pinon Ridge Mill: Operating Plan Tailings Cells and Evaporation Ponds (pdf)
- (Attachment 2) Uranium Mill Tailings Radon Flux Calculations: Pinon Ridge Project, Montrose County, Colorado (pdf)
- (Attachment 3) Pinon Ridge: Water Balance Calculation, Tailings Cell (pdf)
- (Attachment 4) Tailings Cell Design Report: Pinon Ridge Project, Montrose County, Colorado (pdf)
- Evaporation Pond Design Report: Pinon Ridge Project, Montrose County, Colorado (pdf)
- Evaporation Pond Radon Flux Analysis: Pinon Ridge Project, Montrose County, Colorado (pdf)
- Raffinate Characterization: Pinon Ridge Mill, Montrose County, Colorado (pdf)