BIG RIVER MINE TAILINGS/ST. JOE MINERALS CORP.
DESLOGE, MO
Superfund Site Profile
Site Contacts
Community Involvement Coordinator
Elizabeth Kramer
[email protected]
(913) 551-7186
Remedial Project Manager
Rachel Page
[email protected]
(913) 551-7581
Site Location
Street Address:SECTION 25 26 35 & 36 T37N R4E
DESLOGE, MO 63601
Announcements and Key Topics
On Jan. 17, 2024, the U.S. Environmental Protection Agency (EPA) announced it was lowering the screening level for lead in soil at residential properties from 400 parts per million (ppm) to 200 ppm. At residential properties with multiple sources of lead exposure, EPA will generally use 100 ppm as the screening level.
EPA Region 7 plans to use the new screening ...
Continue reading announcements and key topics »
Background
The Big River Mine Tailings/St. Joe Minerals Corp. Site is located in a former mining region known as the "Old Lead Belt,” which is 70 miles south of St. Louis. This ...
Continue reading background »