Electronic Reporting for EPA's NPDES General Permits
The NPDES Electronic Reporting Rule requires regulated entities to submit information electronically to EPA instead of filing paper reports. Electronic reporting is required for construction sites, industrial facilities, pesticides, and vessel operators to apply for coverage under EPA's:
- Construction General Permit (CGP),
- Multi-Sector General Permit (MSGP),
- Pesticides General Permit (PGP), and
- Vessel General Permit (VGP).
EPA's Construction General Permit (CGP) (construction stormwater)
Obtaining coverage under EPA's CGP
Search for NOIs and LEWs submitted under the 2017 CGP and 2022 CGP
EPA's Multi-Sector General Permit (MSGP) (industrial stormwater)
Obtaining coverage under EPA's MSGP
Search for NOIs and NECs submitted under the 2015 and 2021 MSGP
EPA's Pesticides General Permit (PGP)
Obtaining coverage under EPA's PGP
Search for NOIs and annual reports submitted under the 2021 PGP
EPA's Vessel General Permit (VGP)
Obtaining coverage under EPA's VGP
Search for NOIs and annual reports submitted under the 2013 VGP