Stormwater Phase II Final Rule Fact Sheet Series
Small MS4 Program
Minimum Control Measures
- Public Education and Outreach Minimum Control Measure (Fact Sheet 2.3) (pdf)
- Public Participation/Involvement Minimum Control Measures (Fact Sheet 2.4) (pdf)
- Illicit Discharge Detection and Elimination Minimum Control Measure (Fact Sheet 2.5) (pdf)
- Construction Site Runoff Control Minimum Control Measure (Fact Sheet 2.6) (pdf)
- Post Construction Runoff Control Minimum Control Measure (Fact Sheet 2.7) (pdf)
- Pollution Prevention/Good Housekeeping Minimum Control Measure (Fact Sheet 2.8) (pdf)
Permitting
- Permitting and Reporting: The Process and Requirements (Fact Sheet 2.9) (pdf)
- Federal and State Operated MS4s: Program Implementation (Fact Sheet 2.10) (pdf)
- Small Construction Program Overview (Fact Sheet 3.0) (pdf)
- Construction Rainfall Erosivity Waiver (Fact Sheet 3.1) (pdf)
- Conditional No Exposure Exclusion for Industrial Activity Fact Sheet (Fact Sheet 4.0) (pdf)