October 2016 TIRM Report List of Appendices
Appendices to the October 2016 Red Hill Administrative Order on Consent (AOC) Statement of Work (SOW) Tank Inspection, Repair & Maintenance (TIRM) Report.
Red Hill AOC SOW TIRM Report: List of Appendices (pdf)
Red Hill AOC SOW TIRM Report: Appendices A-I (pdf)
- A: Telltale Piping Holes
- B: Red Hill Dome Truss Scaffold
- C: Red Hill Monorail Scaffold
- D: Boom and Basket System
- E: API 653 Inspection Report Tank 13 July 1995
- F: API 653 Inspection Report Tank 10 1998
- G: API 653 Report Tank 7 1998
- H: API 653 Report Tank 8 1998
- I: Contract Number FA8903-04-D-8681-0176-All
Red Hill AOC SOW TIRM Report: Appendix J (pdf)
Red Hill AOC SOW TIRM Report: Appendix K (pdf)
Red Hill AOC SOW TIRM Report: Appendix L (pdf)
Red Hill AOC SOW TIRM Report: Appendices M-Q (pdf)
- M: Contract Number N47408-04-D-8503-0031-All
- N: API 653 Inspection Tank 2 2008
- O: API 653 Inspection Tank 20 2008
- P: Contract Number N62583-09-D-0132-0003-All
- Q: WGS Daily Production Report Tanks 5 and 17
Red Hill AOC SOW TIRM Report: Appendix R (pdf)
Red Hill AOC SOW TIRM Report: Appendix S (pdf)
Red Hill AOC SOW TIRM Report: Appendix T (pdf)
Red Hill AOC SOW TIRM Report: Appendices U-X (pdf)
- U: CSI Services – Daily Coating Inspection Report
- V: WGS Work Plan – Abrasive Blasting and Surface Preparation 2012
- W: WGS Warranty Work Plan
- X: NAVFAC Drawing No. 7019545 MILCON P-060 coating details
Appendix Y: Not Used
Appendix Z: Not Used
Red Hill AOC SOW TIRM Report: Appendices AA-AG (pdf)
- AA: WGS Analysis Hydro Report
- AB: WGS Redhill Complex TK 5 Project – Pressure Test Log
- AC: Willbros D0132 DO 3 Red Hill mod 9
- AD: WGS ASNT Records
- AE: Tank 5 Inspection Checklist
- AF: FY-78 MILCON P-060 Scope of Work
- AG: WGS Weld WPS and PQR
Red Hill AOC SOW TIRM Report: Appendices AH-AS (pdf)
- AH: WGS WPQ Records
- AI: WGS Daily Report 01-16-13 Rev 0
- AJ: Tank 5 Warranty notice
- AK: Notice to Proceed Oct 2014
- AL: TK 5 Visual Inspection Report Signed
- AM: TK 5 MT-LT Inspection Report
- AN: WGS Tank 5 Work Plan Appendix M
- AO: WGS Free Product Report
- AP: WGS Tank 5 Pressure Testing Procedure Jun 2014
- AQ: WGS Tank 5 Pressure Testing Report Jun 2014
- AR: QASP RHT5 Warranty Rework
- AS: WGS Tank 5 Suitability For Service Statement
Red Hill AOC SOW TIRM Report: Appendix AT (pdf)
Red Hill AOC SOW TIRM Report: Appendices AU-BP (pdf)
- AU: WGS D-0132 Basic Award
- AV: WGS Sample and Drain Line Drawings
- AW: WGS Tank 5 Repairs – Repair NDE QC Data
- AX: List of Welder PQR
- AY: API Inspector Qualifications
- AZ: NAVSUP GLS Instruction 10345.1 – Fuel Tank Return to Service
- BA: Contract Number N62742-03-C-1402-All
- BB: Red Hill Tank 5 Inspection SOW
- BC: Generic 653 SOW April2010
- BD: UFGS Section 33 56 17.00 20
- BE: UFGS Section 33 56 18.00 20
- BF: Telltale Leak Detection System
- BG: DLA ATG Policy Letter 2009
- BH: NAVSEA 5104 14 August 2011 RSO Application
- BI: NAVFACINST 5104 1
- BJ: Report on the Trip to Pacific Division Naval Facilities Command
- BK: Acquisition Schedule Red Hill CIR
- BL: Overall CIR Schedule without modification
- BM: Red Hill Tank CIR Contract Sequencing
- BN: Contract Number N39430-15-D-1632-0005 Tanks 14, 17, 18
- BO: Contract Number N39430-15-D-1632-0004 Tanks 4, 13
- BP: NAVFAC Drawing No. 7019544 MILCON P-060